|  |
| Title:
|
MIV Project: Executive Summary |
| Type:
|
ReportReport |
| Participant(s):
|
Forfatter:
Ravazzotti, Mariolina T.
Alenia Spa, Turin
Technical University of Denmark
Email:
Forfatter:
Neefs, Marc
Fokker Space Systems
|
| Abstract:
|
Under the ESA contract #11453/95/NL/JG(SC), aiming at assessing
the feasibility of Rendez-vous and docking of unmanned
spacecrafts, a reference mission scenario was defined. This report
gives an executive summary of the achievements and results from
the project. |
| Published:
|
|
|
|